Home       Project Information        The Team       Client & Advisors       Documents
1.0 Personnel
Position
Hours
Rate, $/hr
Cost, $

SENG
118
172
20249

ENG
381
70
26554

LAB
127
45
5747

INT
221
20
4403

Total Personnel


$        56,954
2.0 Travel
Local Meetings


$               0
3.0 Subcontractor
Lab
6
11
$              66





4.0 TOTAL



$        57,020
This is the cost analysis of the project. The costs are split up by personnel, travel, and a lab subcontractor. The majority of the costs was for personnel. There were no expenses in travel because there was no travel associated with this project outside of going to and from the engineering building. All travel expenses associated with going to the WERC compeition was paid for by the university. With a low cost from a lab subcontractor, the total cost of this project is $57,020.
RAVA Fontus Engineering Inc.                                                                                Updated: 5/1/14
Cost Analysis
Photo Credit: Google
RAVA Fontus Engineering Inc.